Solar & wind project approvals in Rajasthan — complete regulatory roadmap
Everything a developer, EPC or industrial consumer needs to navigate Rajasthan's power-project approvals: the state agencies, open-access and banking rules, net-metering caps, land rules and the state-specific steps layered on top of national approvals.
Key agencies in Rajasthan
| State Transmission Utility (STU) | Rajasthan Rajya Vidyut Prasaran Nigam Ltd (RVPN) |
|---|---|
| Distribution companies (discoms) | JVVNL (Jaipur), AVVNL (Ajmer), JdVVNL (Jodhpur) |
| State nodal agency (RE) | Rajasthan Renewable Energy Corporation Ltd (RRECL) |
| Electricity regulator | Rajasthan Electricity Regulatory Commission (RERC) |
| Electrical safety (CEIG) | Electrical Inspectorate Department, Government of Rajasthan (Jaipur) — verify the jurisdictional office |
Open access, banking & net metering in Rajasthan
Green energy open access
100 kW open-access threshold per the central GEOA Rules 2022.
Banking
RERC GEOA Regulations 2025: banking with 8% deduction in kind, 30% cap.
Net metering
Rooftop net metering capped around 1000 kW per current state regulation — verify with the discom.
Worth knowing
Strongest solar resource in India; new Feb-2026 RVPN connectivity procedure is in transition — verify the current process with RVPN.
Land rules
Rajasthan's solar policy provides streamlined land-conversion routes and solar-park allotments via RRECL — verify current district-level rules with the collector's office. See the national guides for land-use conversion and land title & government allotment.
Approvals with Rajasthan-specific procedures
- STU connectivity & evacuation approval — For projects connecting within one state's grid — connectivity approval from the state transmission utility,…
- Net-metering / interconnection agreement — The agreement letting you export solar power to the grid and offset your bill — capacity caps and tariffs…
- Land title, lease & government land allotment — Securing clear legal rights over the project land — purchase/lease of private land or allotment of…
- Land-use / NA (non-agricultural) conversion — Converting agricultural land for project use — several launch states now exempt solar entirely, others have…
- CEIG approvals — drawings, inspection & charging (3-touch) — Safety sign-off on your electrical installation in three touches: drawings approved before you build,…
- State nodal agency registration & single window — Registering your project with the state's renewable-energy nodal agency and single-window portal — the entry…
- Green energy open access & banking approvals — The approvals to wheel green power to a consumer over the grid — GEOA registration, SLDC/discom concurrence…
National approvals that apply in Rajasthan
- ISTS connectivity & GNA (General Network Access)
- Land title, lease & government land allotment
- Section 68 prior approval (overhead lines)
- Right of Way (RoW) compensation process
- CEIG approvals — drawings, inspection & charging (3-touch)
- SLDC/RLDC first-time charging & synchronization
Browse all 32 approvals, or generate the exact list for your project:
Map my project's full approval roadmap →Should my business switch to green power?
Frequently asked questions
Who is the State Transmission Utility (STU) in Rajasthan?
Rajasthan Rajya Vidyut Prasaran Nigam Ltd (RVPN). Intra-state (InSTS) connectivity applications for utility-scale projects are made to RVPN.
Which agency handles renewable energy approvals in Rajasthan?
Rajasthan Renewable Energy Corporation Ltd (RRECL) is the state nodal agency; the state regulator is Rajasthan Electricity Regulatory Commission (RERC).
What are the open access rules in Rajasthan?
100 kW open-access threshold per the central GEOA Rules 2022. Verify the currently applicable regulation with RERC.
What are the banking rules for green energy in Rajasthan?
RERC GEOA Regulations 2025: banking with 8% deduction in kind, 30% cap. Banking rules change frequently — verify with the discom/RERC.
What is the net-metering cap in Rajasthan?
Rooftop net metering is capped around 1000 kW per the state regulation — verify the current cap and any network charges with the discom.
State rules change frequently. This page reflects the RegNav knowledge base — indicative guidance, not legal advice. Verify with RERC, RVPN and the concerned departments.