HomeApprovals › Net-metering / interconnection agreement

Net-metering / interconnection agreement — documents, timeline & process

R1 · Pre-development approvals · ~30 days (indicative)

The agreement letting you export solar power to the grid and offset your bill — capacity caps and tariffs differ sharply by state.

Portal application → feasibility → agreement → installation → inspection → meter → synchronization.

Solar PV (rooftop)

Statutory basis & authority

Statutory basisState ERC net-metering / renewable energy regulations
AuthorityState discom
DepartmentDiscom (distribution utility)
Indicative timeline~30 days (verify with the authority)
Fees₹500–5,000 application + meter cost ⚑

Documents required

When is this required?

State-specific notes

Maharashtra

States: Maharashtra

Authority: MSEDCL

Gujarat

States: Gujarat

Authority: Gujarat discoms (DGVCL/MGVCL/PGVCL/UGVCL/Torrent)

Karnataka

States: Karnataka

Authority: ESCOMs (BESCOM etc.)

Rajasthan

States: Rajasthan

Authority: Rajasthan discoms (JVVNL/AVVNL/JdVVNL)

Uttar Pradesh

States: Uttar Pradesh

Authority: UPPCL discoms via UPNEDA portal

Madhya Pradesh ⚑

States: Madhya Pradesh

Authority: MP discoms

Chhattisgarh ⚑

States: Chhattisgarh

Authority: CSPDCL (Unified Solar Rooftop Portal)

Andhra Pradesh ⚑

States: Andhra Pradesh

Authority: AP discoms

Tamil Nadu ⚑

States: Tamil Nadu

Authority: TNPDCL (ex-TANGEDCO)

Haryana ⚑

States: Haryana

Authority: Haryana discoms (UHBVN/DHBVN)

Punjab ⚑

States: Punjab

Authority: PSPCL solar portal

Complete these first

Solarian expert note

Capacity typically capped at sanctioned load / past-12-month consumption — check the state cap before sizing.

Frequently asked questions

What is Net-metering / interconnection agreement?

The agreement letting you export solar power to the grid and offset your bill — capacity caps and tariffs differ sharply by state.

How long does Net-metering / interconnection agreement take?

Around 30 days as an indicative planning figure. Actual timelines vary by authority workload and application quality — verify with the concerned authority.

Which authority grants Net-metering / interconnection agreement?

State discom. Department: Discom (distribution utility).

What documents are required for Net-metering / interconnection agreement?

Application on discom portal; Sanctioned load proof; System sizing details / SLD; Agreement on stamp paper (some states).

When is Net-metering / interconnection agreement required?

Project type: Solar PV (ground-mounted) / Wind / Hybrid (solar + wind) / Standalone BESS; Connectivity level: Discom (distribution). Project type: Solar PV (rooftop).

Related approvals in this phase

See also: all approvals · glossary of terms · state roadmaps

Map my project's full approval roadmap →Should my business switch to green power?

Indicative guidance from the RegNav knowledge base, expert-verified by Solarian. Not legal advice — always verify with the concerned authority.