HomeApprovals › PTCC clearance (power–telecom coordination)

PTCC clearance (power–telecom coordination) — documents, timeline & process

R3 · Route & construction authorizations · ~90 days (indicative)

Important: Conditional — PTCC clearance was abolished by the Ministry of Power w.e.f. 01-Jul-2026 for new lines; CEA substitute coordination guidelines are awaited. Verify current applicability with the concerned authority before relying on this page.

Confirms your power line won't interfere with nearby telecom infrastructure — required before stringing conductors. NOTE: scrapped by MoP for new lines w.e.f. 01-Jul-2026; CEA substitute guidelines awaited.

Legacy process: route survey to DET(PTCC)/BSNL → telecom asset details → induced-voltage calculation → Railway/Army recommendations → Route Approval Certificate.

Transmission lineSolar PV (ground-mounted)WindHybrid (solar + wind)Standalone BESS

Statutory basis & authority

Statutory basisCoordination convention under EA 2003 s.160 + PTCC Manual; MoP decision Apr-2026 abolishing from 01-Jul-2026 ⚑ (no gazette/OM located yet)
AuthorityCentral PTCC (DoT/BSNL DET-PTCC + CEA PCD + Railways + MoD) ≥220 kV; State/Regional PTCC 33–132 kV
DepartmentPTCC nodal (DoT/BSNL + CEA)
Indicative timeline~90 days (verify with the authority)
FeesAs per PTCC manual (legacy)

Documents required

When is this required?

Conditional: PTCC abolished for new lines from 01-Jul-2026 — verify whether it applies to your case — verify with the concerned authority.

Complete these first

Solarian expert note

PTCC clearance requirement scrapped by MoP w.e.f. 01-Jul-2026; CEA coordination guidelines awaited — confirm the current requirement for your line before route survey. In-flight applications: treatment unclear. ⚑

Frequently asked questions

What is PTCC clearance (power–telecom coordination)?

Confirms your power line won't interfere with nearby telecom infrastructure — required before stringing conductors. NOTE: scrapped by MoP for new lines w.e.f. 01-Jul-2026; CEA substitute guidelines awaited.

How long does PTCC clearance (power–telecom coordination) take?

Around 90 days as an indicative planning figure. Actual timelines vary by authority workload and application quality — verify with the concerned authority.

Which authority grants PTCC clearance (power–telecom coordination)?

Central PTCC (DoT/BSNL DET-PTCC + CEA PCD + Railways + MoD) ≥220 kV; State/Regional PTCC 33–132 kV. Department: PTCC nodal (DoT/BSNL + CEA).

What documents are required for PTCC clearance (power–telecom coordination)?

Route map + tower schedule/coordinates; Voltage/conductor data; Telecom crossings & parallelism lengths; Induced-voltage calculations.

Is PTCC clearance (power–telecom coordination) always required?

PTCC abolished for new lines from 01-Jul-2026 — verify whether it applies to your case Verify applicability with the concerned authority.

Related approvals in this phase

See also: all approvals · glossary of terms · state roadmaps

Map my project's full approval roadmap →Should my business switch to green power?

Indicative guidance from the RegNav knowledge base, expert-verified by Solarian. Not legal advice — always verify with the concerned authority.