HomeApprovals › Water drawal NOC (construction & module cleaning)

Water drawal NOC (construction & module cleaning) — documents, timeline & process

R2 · Land & environment · ~75 days (indicative)

Permission to draw groundwater (CGWA, via Bhu-Neer portal) or canal water (state irrigation department) for construction and module washing.

Application with hydrogeological report (stressed blocks); flow meter and rainwater-harvesting conditions attach.

Solar PV (ground-mounted)Hybrid (solar + wind)

Statutory basis & authority

Statutory basisCGWA guidelines; state groundwater acts
AuthorityCGWA (Bhu-Neer portal) or state groundwater authority; Irrigation/WRD for canal water
DepartmentCGWA / State irrigation department
Indicative timeline~75 days (verify with the authority)
Fees₹10,000 application + volume-based abstraction charges

Documents required

When is this required?

Conditional: Needed only where ground/canal water will be drawn — confirm your water source — verify with the concerned authority.

Solarian expert note

Canal allocation is case-by-case and can take 3–6 months — start early if module cleaning depends on it. ⚑

Frequently asked questions

What is Water drawal NOC (construction & module cleaning)?

Permission to draw groundwater (CGWA, via Bhu-Neer portal) or canal water (state irrigation department) for construction and module washing.

How long does Water drawal NOC (construction & module cleaning) take?

Around 75 days as an indicative planning figure. Actual timelines vary by authority workload and application quality — verify with the concerned authority.

Which authority grants Water drawal NOC (construction & module cleaning)?

CGWA (Bhu-Neer portal) or state groundwater authority; Irrigation/WRD for canal water. Department: CGWA / State irrigation department.

What documents are required for Water drawal NOC (construction & module cleaning)?

Application + site details; Hydrogeological report (stressed blocks); Water requirement estimate.

Is Water drawal NOC (construction & module cleaning) always required?

Needed only where ground/canal water will be drawn — confirm your water source Verify applicability with the concerned authority.

Related approvals in this phase

See also: all approvals · glossary of terms · state roadmaps

Map my project's full approval roadmap →Should my business switch to green power?

Indicative guidance from the RegNav knowledge base, expert-verified by Solarian. Not legal advice — always verify with the concerned authority.