AAI
Airports Authority of India — issues height NOCs for structures near airports via NOCAS.
Additional Surcharge
A per-unit open-access charge compensating the discom for stranded power-purchase commitments.
ALMM
Approved List of Models & Manufacturers — MNRE's list of approved solar modules (and cells) mandatory for most Indian projects.
Banking
Storing surplus green energy with the grid and withdrawing it later, per state-specific banking rules and charges.
BESS
Battery Energy Storage System — grid-scale batteries, standalone or paired with solar/wind.
Captive
A project where consumers hold ≥26% equity and consume ≥51% of generation (Electricity Rules 2005) — exempt from CSS/additional surcharge.
CEA
Central Electricity Authority — the technical body that scrutinises applications before Ministry of Power approval.
CEIG
Chief Electrical Inspector to Government — the state safety authority that approves electrical drawings, inspects the installation, and permits charging.
CERC
Central Electricity Regulatory Commission — the central regulator for interstate transmission, tariffs and grid access.
CGWA
Central Ground Water Authority — grants NOCs for groundwater drawal, relevant to construction and plant water use.
COD
Commercial Operation Date — the date a project is declared commercially operational, triggering PPA obligations.
CSS
Cross-Subsidy Surcharge — a per-unit charge on open-access consumers compensating the discom for lost cross-subsidy.
CTE
Consent to Establish — the pollution-control-board approval needed before construction of listed industries.
CTO
Consent to Operate — the pollution-control-board approval needed before operations begin.
CTU
Central Transmission Utility — the national interstate grid operator (CTUIL). Large projects selling across state lines connect here.
CTUIL
Central Transmission Utility of India Ltd — the nodal agency for national-grid (ISTS) connectivity applications.
DCR
Domestic Content Requirement — tenders/schemes requiring Indian-made modules or cells.
discom
Distribution company — the local utility that supplies electricity to end consumers.
EPC
Engineering, Procurement & Construction — the contractor who builds the plant.
FC Act
Forest (Conservation) Act 1980 — the statute requiring central approval before forest land is used for non-forest purposes.
First-time charging
The SLDC/RLDC-supervised first energisation of a new plant or line, after CEIG approval and grid-code compliance.
GEOA
Green Energy Open Access — the 2022 central rules (and state regulations) allowing consumers ≥100 kW to buy green power over the grid.
GNA
General Network Access — the CTUIL application that gives your project the right to use the national grid. It replaced the older LTA/MTOA regime.
GOAR
Green Open Access Registry (greenopenaccess.in) — the national portal where GEOA applications are registered.
Grid Code
The technical rules (CEA/IEGC and state codes) a plant must meet for protection, telemetry and grid connection.
Group captive
A captive structure where multiple consumers jointly hold the ≥26% equity and consume ≥51% of generation.
InSTS
Intra-State Transmission System — the state-level grid operated by the STU.
IPP
Independent Power Producer — a company that builds and owns power plants to sell electricity.
ISTS
Inter-State Transmission System — the national grid that carries power across state borders.
LTA
Long-Term Access — the pre-2022 regime for long-duration interstate transmission rights, replaced by GNA under the CERC Connectivity & GNA Regulations 2022.
MNRE
Ministry of New & Renewable Energy — the central ministry for renewable energy policy, schemes and ALMM.
MoEFCC
Ministry of Environment, Forest & Climate Change — grants forest and wildlife clearances.
MoP
Ministry of Power — the central ministry that grants Section 68 and Section 164 approvals.
NBWL
National Board for Wildlife — clears projects inside or near protected areas.
Net metering
A billing arrangement where rooftop-solar exports offset imports, subject to state capacity caps.
NHAI
National Highways Authority of India — grants permission for transmission-line crossings over national highways.
NOCAS
AAI's No Objection Certificate Application System — the online portal for height clearance near airports.
NSWS
National Single Window System — the central government portal where Section 68/164 applications are filed.
Open access
The right of large consumers (≥100 kW under GEOA) to buy power from suppliers other than their discom, delivered over the grid.
PARIVESH
The MoEFCC online portal for forest, wildlife and environment clearances.
PPA
Power Purchase Agreement — the long-term contract to sell a project's power.
PTCC
Power & Telecommunication Coordination Committee — the (legacy) clearance confirming a power line won't interfere with telecom infrastructure. Abolished by the Ministry of Power for new lines w.e.f. 01-Jul-2026; CEA substitute guidelines awaited.
REC
Renewable Energy Certificate — a tradable certificate representing the green attribute of 1 MWh of renewable energy.
RLDC
Regional Load Despatch Centre — the regional grid operator for ISTS-connected projects.
RoW
Right of Way — the legal process (and compensation framework) for placing towers and lines over land you don't own.
SECI
Solar Energy Corporation of India — the central agency that runs renewable energy tenders.
Section 164
Section 164, Electricity Act 2003 — confers Telegraph-Act powers on a licensee to place lines over private land with legal backing.
Section 68
Section 68, Electricity Act 2003 — prior Central/State Government approval to install an overhead transmission line.
SERC
State Electricity Regulatory Commission — each state's power regulator (e.g., MERC, RERC, GERC), setting open-access, banking and net-metering rules.
SLDC
State Load Despatch Centre — the state grid operator that coordinates first-time charging and synchronization.
SPCB
State Pollution Control Board — issues consent to establish/operate (solar PV is exempt since Nov-2024).
STU
State Transmission Utility — your state's transmission network (e.g., MSETCL in Maharashtra, RVPN in Rajasthan). Power stays within the state.
T-GNA
Temporary General Network Access — short-duration grid access granted via the RLDC/NLDC, typically for merchant or short-term sales.
Wheeling
Transporting power over transmission/distribution networks from a generator to a consumer, for a wheeling charge.

Deep dives: all approvals · state roadmaps